产品展示

产品展示

current position: Home > Product Center > Refractory Protective Shells

contact usContact Us

Changshu Renyang Lianghong Stainless Steel Arts Factory

Contact: Jie Shen

Telephones:+86 0512-52586666

Fax:+86 0512-52580998

Mail:sd@cslhsd.com 

Web:www.cslhbxg.com

Address:No. 66, Huanxi Road, Renyang Town, Zhitang Town, Changshu City, Suzhou, China

Refractory Protective Shells

Refractory Protective Shells

  • Category:Refractory Protective Shells
  • Browse number:
  • QR code:
  • Release time:2024-05-06 10:27:34
  • Product description

A refractory protective casing is an important facility used to protect buildings and equipment from being damaged in the event of a fire. Its installation is crucial to effectively slow down the spread of fire and protect the safety of buildings and equipment. Below we will detail the steps and precautions for the installation of fireproof material protective shell.


1. Pre-construction preparation:

Before installing the refractory protective casing, the first thing to do is to do the pre-construction preparation work. This includes determining the size and model of the protective shell, preparing the necessary installation tools and materials, checking whether the condition of the building and equipment meets the installation requirements, and so on.


2. Installation position determination:

According to the specific conditions of the building and equipment, determine the installation position of the refractory protective shell. It should be noted that the installation location should try to avoid flammable materials and fire sources to ensure safe use.


3. Fixed bracket installation:

After determining the installation location, the fixed bracket needs to be installed first. The selection and installation of the bracket should be in line with the weight and safety requirements of the fire-resistant protective shell, fixed firmly.


4. Protective shell installation:

Place the refractory protective casing on the bracket according to the requirements and fix it firmly with bolts and other fixing equipment. Ensure that the protective shell is installed correctly, smoothly and firmly.


5. Pipe connection:

If the protective shell is used for the protection of piping equipment, it is necessary to connect the piping and equipment. The pipeline connection should be firm, without water and air leakage to ensure normal use.


6. Grounding:

After the installation is completed, the protective shell needs to be grounded to ensure static electricity and other safety issues. Grounding treatment should be in line with relevant standards and regulations to ensure safety and reliability.


7. Regular inspection and maintenance:

After the installation is completed, you need to regularly check the condition of the protective shell, timely detection of problems and maintenance. Maintain the good condition of the protective shell to extend the service life.


In short, the refractory protective shell installation is a very important work, directly related to the safety of the building and equipment. In the installation process needs to be strictly in accordance with the relevant regulations and requirements for operation, to ensure safety and reliability. At the same time, after installation, we should do a good job of regular inspection and maintenance work to ensure the normal use of the protective shell. I hope the above introduction will be helpful to you.


Tags

Previous:Refractory Protective Shells2024-05-06
  • menu
Service Hotline:

+86 0512-52586666

Shen Jie

+86 0512-52580998

Telex

Address:No. 66, Huanxi Road, Renyang Town, Zhitang Town, Changshu City, Suzhou, China

Focus

Focus

Official Website

Official Website